Following our visit to Stafford Show we received an order for a Ensign 6 Package Treatment Plant with a pumped outlet and 750 mm invert (modified at Marsh Industries factory), to accommodate the foul drainage which would be directed under the property and to then enter the treatment plant within the rear garden of the barn conversion, uplifting the treated effluent into the existing shared drainage field on behalf of Mr A Gaynon at Over Peover.

The treatment plant was delivered on the 29th May 2015 and the installation was completed by Friday 5th June 2015.