Installation of Sewage Treatment Plant at Oakhanger, Crewe
Monday 23rd February 2015
We were requested to replace a failing treatment plant, which served 3x three-bedroom properties.
Access was difficult due to the property being situated on the main A road. The only access was via the removal of approximately three meters of hedge row.
A Marsh Ensign 16 PE package treatment plant was recommended and delivered to site by our installation team.
Treatment plant onsite, 5 ton track machine excavating area to position treatment plant, and stockpile excess spoil for offsite transfer.
Excavation adjacent to original sewage plant (brick constructed primary sedimentation tank) waiting delivery of concrete to form a base incorporating securing points.
Position tank, strap and secure into position, surround with concrete, backfill with as dug spoil.
Ground wet, waiting for turf and gravel….hope the weather improves?!
Level and prep garden area, transfer excess spoil offsite, turf, and gravel area as requested by the Client.
Job completed, left site on the 4th of March 2015.